Blog #10 2/25/19

We have everything figured out in terms of equipment needs, props, and everything else we are going to include in our films. We fixed our script to the needs of the last time we had problems with it. Our main problem wasn’t the text that was being used, it was mostly the format in which you are supposed to lay out the script. I think our biggest obstacle that will come our way is scheduling. The reason being is that the people in the group have after school activities so we will have limited days in which we can meet. This means that we will have to get a lot of work done on those limited days in which we can meet.

Leave a comment